We earn a commission if you buy through links on this page, at no cost to you. How we choose products
The best time to repair concrete cracks outdoors is a dry, mild day in spring or fall, after a few days without rain. The UV slab kit's and joint kit's polyurea needs concrete at 50°F or warmer, penetrating sealers go on from 40°F to 95°F, and foam injection kits should follow the temperatures on their label. Indoors, a heated basement works year round.
Before you start
Cold isn't the only thing that stops a crack repair. Wait if any of these fit.
- The crack is damp, or there's frost, snow or ice on the slab
- The concrete itself is colder than the product's minimum, even if the air feels warm
- The cartridges have been sitting in a cold garage or car
If any of these fit, find out who to call first: a structural engineer or a repair contractor.
When is the best time to repair concrete cracks?
A dry, mild day in spring or fall, after a few days without rain. That gives you concrete warm enough for the fillers, a crack that’s fully dry, and a crack width in the middle of its seasonal range.
Dry matters as much as warm. The slab kit’s instructions say it’s critical that the crack be dry, and the University of Missouri Extension’s sidewalk guide says to repair only when concrete is dry (opens in a new tab).
Mild matters because concrete moves with temperature. The Federal Highway Administration notes that how far a sealed joint has to stretch depends on the temperature at the time of sealing, and the annual low temperature (opens in a new tab). A crack filled on a mild day is partway open, so the filler has less to stretch when winter pulls the slab apart.
Can you fill concrete cracks in cold weather?
Not with the outdoor kits below 50°F. The UV slab kit’s urethane data sheet says it works even in cold conditions, but the polyurea top that finishes the repair needs concrete at least 50°F, so that kit as a whole needs a 50°F slab. The indoor slab kit is urethane only, with no polyurea, so its data sheet says it works even in cold conditions. Follow the range on its label.
The same goes for the joint kit, which uses the same polyurea. Its data sheet also calls for concrete at 50°F or warmer.
What counts is the temperature of the concrete, not the air. A slab can stay cold well into a sunny morning, so check it with a surface thermometer, or wait for a stretch of mild days and work in the afternoon.
Basements are different. A heated basement is workable all winter. In an unheated one, warm the room for a day before you start and follow the kit’s label.
What is the minimum temperature for concrete sealant?
It depends on the product, so read its label. Penetrating sealers in the PS series go on between 40°F and 95°F and the TS210 garage floor coating between 60°F and 90°F, according to their data sheets. The sealer maker’s FAQ gives 50°F to 85°F for topical sealers in general.
For highway joints, the Federal Highway Administration recommends that the joint sealant is installed in temperatures no less than 40°F (opens in a new tab). Home crack and joint fillers set their own limits, and the polyurea in the UV slab and joint kits needs 50°F.
Rain matters too. Penetrating sealers need 12 hours without rain after you apply them, or 24 hours for PS100, according to their data sheets.
What about foam injection kits in a cold basement?
Follow the temperatures on the kit’s label, and keep the cartridges warm. The foam kit’s instructions don’t give a minimum application temperature, so this guide doesn’t make one up.
What the foam and paste data say:
- Storage. The foam’s safety data sheet says to store it between 60°F and 85°F. If it freezes, thaw it thoroughly and mix it until uniform.
- Warm the cartridge for hairline cracks. The peel-off kit’s instructions suggest setting the foam cartridge in a pail of hot tap water for 15 to 20 minutes so it flows into thin cracks more easily.
- Peel-off paste slows in the cold. Its data sheet says to condition it to 65°F to 85°F, and lists its tack-free time as 25 to 30 minutes at 73°F but 1 to 1 1/2 hours at 40°F.
- Dry surface for the paste. The peel-off paste won’t cure on a damp wall, while the epoxy paste cures in damp conditions.
Most basement walls are injected from inside, so warming the room for a day before you start solves most of this. The crack injection guide has the full method, and the peel-off vs epoxy paste comparison helps you pick a kit for a cold or damp wall.
Cold isn’t the only limit on wall cracks. Horizontal cracks, bowing walls, offset edges, block stair-step cracks and wall cracks over 1/4 inch go to a structural engineer, in any season.
What do you need to fill an outdoor crack in cool weather?
The UV slab kit, dry silica sand, a few hand tools and a way to check the slab’s temperature. Keep the cartridges indoors until you use them: the polyurea’s data sheet says to store them between 60°F and 90°F and that they work best kept at 70°F or warmer.
- Surface thermometer for the slab
- Tuckpoint grinder with a diamond blade, for cracks 1/8 inch and narrower
- Safety glasses, dust mask and gloves
- Shop vacuum and a stiff brush
- Dry silica sand
- Caulk gun and razor scraper
Not sure this kit fits your crack? The product chooser sorts fillers by width and location.
How do you fill a concrete crack in cool weather?
The same way as in summer, with a temperature check first and the cartridges kept warm. This is the method in the slab kit’s instructions, for cracks up to 1/4 inch with flush edges.
Check the slab temperature
Make sure the concrete is at 50°F or warmer, and will stay there until the top has set.Bring the cartridges in
Keep them indoors at 70°F or warmer overnight, and carry them out only when you’re ready.Open up thin cracks
For cracks 1/8 inch wide or less, the kit’s instructions say to grind the crack out to 1/4 inch wide and 1/4 inch deep. Wider cracks skip this step.Clean and dry the crack
Vacuum out the dust and debris. The instructions say it’s critical that the crack be dry, so skip mornings with dew or frost.Prime with urethane
Wet the inside of the crack with the kit’s urethane. Just wet it, don’t fill it.Pack in sand
Pour dry silica sand into the crack until it’s 1/4 inch below the surface.Soak the sand
Saturate the sand with more urethane and let it set for about 30 minutes.Top it off
Fill the last 1/4 inch with the polyurea filler. It’s thin and levels itself.Scrape it flush
Scrape any overflow flush with a razor scraper, then keep traffic off until it’s ready.
How long do crack repairs take to cure?
Under an hour for the slab and joint kits at 70°F, a few hours for foam injection, and up to 3 days for epoxy paste. Every time below is from the product’s own data sheet or instructions, and cold makes all of them longer.
| Material | Apply between | Light use | Full cure | Source |
|---|---|---|---|---|
| Urethane and sand (UV slab kit, first layer) | Dry crack, concrete cured at least 28 days | Let it set about 30 minutes | Then add the polyurea top | Slab kit data sheet |
| Polyurea top (UV slab kit) | Concrete at 50°F or warmer | Light traffic in 30 minutes at 70°F | Full traffic in 60 minutes at 70°F | Polyurea data sheet |
| Urethane and sand (indoor slab kit, no polyurea) | Dry crack, concrete cured at least 28 days | Initial set in 2 to 4 minutes | Back in service within 20 minutes | Indoor kit urethane data sheet |
| Polyurea joint filler (joint kit) | Concrete at 50°F or warmer, dry | Light traffic in 30 minutes at 70°F | Full traffic in 60 minutes at 70°F | Joint kit data sheet |
| Epoxy paste (foam kit) | Dry surface; cures in damp conditions | Inject once fingernail hard: 2 to 4 hours with the 10 ft kit, about 20 minutes with the 30 ft kit | 1 to 3 days | Kit instructions and epoxy paste data |
| Peel-off paste (foam kit) | Dry surface only; condition the paste to 65°F to 85°F | Tack free in 25 to 30 minutes at 73°F, 1 to 1 1/2 hours at 40°F | Peel off with the ports after 3 or 4 hours | Peel-off paste data sheet |
| Polyurethane foam | Wet or dry crack; store at 60°F to 85°F | Foaming done in about 3 or 4 hours | Knock off ports after 3 or 4 hours | Kit instructions and foam safety data sheet |
| Penetrating sealer (PS series) | Dry surface, 40°F to 95°F, no rain for 12 hours (24 hours for PS100) | Dry to touch in 1 to 3 hours | Foot traffic in 6 to 12 hours | PS-series data sheets |
| TS210 topical (garage floors) | Dry surface, 60°F to 90°F, no water for 48 hours | Light foot traffic in 5 to 7 hours | Vehicles in 24 to 48 hours | TS210 data sheet |
The foam kit's instructions give no minimum application temperature. Follow the label, and warm the room and the cartridges before you start.
Can you repair concrete cracks in late fall?
Yes, as long as you still get dry days with the concrete at 50°F or warmer. Once the slab stays colder than that, clean the crack out, keep the kit indoors and fill it in spring.
Don’t reach for a fast-setting patch to beat the cold. In a Kansas State University field study, rapid repair materials showed almost a 50% reduction in strength (opens in a new tab) of their bond after 5 months of weathering through freezing and thawing.
An open crack over winter isn’t an emergency for most slabs. Water in it can freeze, and the NRMCA explains that water expands as it forms ice and this causes stresses (opens in a new tab), so shovel snow away from it and keep downspouts off it until you can fill it.
Why do concrete cracks look wider in winter?
Because concrete shrinks as it cools. The Federal Highway Administration explains that joints provide relief for concrete expansion and contraction (opens in a new tab) caused by temperature and moisture changes, and cracks open and close the same way.
That’s why a crack you measured in summer can look bigger in January, and why the filler has to stretch. The polyurea’s data sheet lists 170% elongation, which lets it flex with that movement instead of popping loose.
A crack that keeps getting wider year after year, not just in winter, is a different story. The NRMCA says to seek professional advice (opens in a new tab) for active cracks that widen with time, and the crack monitoring guide shows how to track one.
What cold weather mistakes ruin a crack repair?
Filling a crack that’s damp or colder than it looks, and using cold cartridges. Each one weakens the bond.
- Going by the air temperature. The slab can be colder than the air on a sunny morning. Check the concrete.
- Filling after frost or dew. The crack has to be dry, and morning moisture counts.
- Cold cartridges. The data sheet says to keep them at 70°F or warmer for best results and to protect them from freezing.
- Fast-setting patches before winter. The Kansas State study found rapid repair materials lost almost half their bond strength after 5 months of freeze-thaw.
- Salting a fresh repair. The NRMCA says heavy use of de-icers increases potential for scaling (opens in a new tab). Use sand for traction near new work.
The why crack repairs fail guide covers the other causes, and the concrete cracks hub has guides for each kind of slab.
When should you seal concrete after a crack repair?
After the repair cures, on a dry day inside the sealer’s temperature range. The NRMCA calls late summer with a few dry days before application (opens in a new tab) an ideal time to seal, which also gets the slab protected before winter.
The sealing after crack repair guide covers which sealer to use over a repair, and the sealer drying time guide covers how long each one takes.
Questions
Can I use a hair dryer or heater to warm the crack?
Warming the space helps indoors, and keeping the cartridges warm helps anywhere. Outdoors in real cold, a heater warms the surface for a few minutes, not the slab, so wait for a warmer day instead.
Can I fill a crack right after it rains?
No. The slab kit's instructions say it's critical that the crack be dry. Wait for a few dry days, and longer after heavy rain or melting snow.
Is summer a bad time to fill cracks?
Not if the slab is dry and inside the product's temperature range. A crack filled when the concrete is at its warmest has the most stretching to do in winter, so a mild morning beats a hot afternoon.
My new driveway cracked in its first fall. Should I fill it before winter?
Only if the concrete is at least 28 days old, which the slab kit's urethane data sheet requires. The NRMCA also says to avoid de-icing chemicals in the first winter (opens in a new tab) on new concrete.